Eliminate Waste - Reworks

Project Challenge

  1. Eliminate motor rework, averaging 12% of the produced volume daily.

  2. Eliminate overtime.

  3. Perform work within the takt time of the assembly line, which operation did not allow the operator to visualize.

Strategy Applied

  1. Problem investigation using 5 Whys.
  2. Defined a technology to solve the problem (robotization of the operation).
  3. Applied Brainstorming even after conclusion, as it was costly and time-consuming.
  4. Final solution adopted was much simpler and quicker (comparison camera).

Implemented Results

  1. Rework was reduced to ZERO, no more overtime and potential line stoppages at the client.
  2. Waste in overtime of over 15% of the FP eliminated.